Medical Device Development Timeline
An interactive Gantt-style timeline for medical device development — adjustable phases from concept through regulatory submission and commercial launch.
Starter Prompt
Create an interactive Gantt-style timeline for a medical device development program showing phases like Design Input, Design Output, Verification & Validation, and FDA Submission, where I can adjust start dates and durations and see the full schedule update.
Expanded Prompt
Create a Claude Artifact called the Medical Device Development Timeline — an interactive Gantt-style project planner built with HTML, CSS, and JavaScript.
Goal
Give medical device program managers and executives a visual, adjustable timeline that maps the full product development lifecycle from concept through regulatory submission and commercial launch. Make it instantly usable and impressive in a planning meeting or boardroom setting.
Audience
Medical device program managers, product leaders, R&D directors, regulatory affairs teams, and executives overseeing device development programs.
Development Phases to Include
Display these phases as horizontal Gantt bars, in sequence:
| # | Phase | Default Duration |
|---|---|---|
| 1 | Concept & Feasibility | 2 months |
| 2 | Design Planning | 1 month |
| 3 | Design Input | 2 months |
| 4 | Design Output | 3 months |
| 5 | Design Review — Stage Gate | 0.5 months |
| 6 | Verification | 3 months |
| 7 | Validation | 3 months |
| 8 | Design Transfer | 2 months |
| 9 | Regulatory Submission Prep | 2 months |
| 10 | FDA Review | 3 months |
| 11 | Commercial Launch Prep | 2 months |
| 12 | Launch | 0.5 months |
Required Features
- Adjustable start date — user sets the program start date and all phases cascade from it
- Editable durations — user can change the duration of each phase in months
- Live Gantt update — the chart redraws whenever a date or duration changes
- Phase dependencies — each phase starts after the previous one ends (sequential by default)
- Milestone markers — visually mark Design Review, FDA Submission, and Launch as milestones
- Total program duration — display the calculated end-to-end timeline in months
Display Requirements
Gantt Chart
- Horizontal bars proportional to duration
- Phase names on the left
- Month/quarter markers along the top axis
- Color-coded by phase category:
- Design Control phases: blue
- Testing phases (V&V): purple
- Regulatory phases: orange
- Launch phases: green
- Milestones: diamond markers in a contrasting color
Summary Panel
- Program start date
- Projected submission date
- Projected launch date
- Total program duration in months
Optional Controls
- Toggle to show/hide phase descriptions
- A “Reset to Defaults” button
- Phase status indicators: Not Started, In Progress, Complete (color-coded dots)
Design Requirements
- Clean, modern project management aesthetic
- Suitable for executive presentations and program reviews
- Readable at a glance — no clutter
- Mobile-friendly with horizontal scroll on the Gantt chart
- Professional color palette
Disclaimer
This timeline is for planning and illustration purposes only. Actual program timelines vary based on device complexity, regulatory pathway, clinical requirements, and organizational factors.
Tips for Refining
- “Add a parallel track for clinical study activities”
- “Make phases draggable on the Gantt chart”
- “Add a risk flag column next to each phase”
- “Export the timeline as a PNG image”